Home | Example of MT treated soil | Products | FAQs

| 1.Test method |
| ①Put about 30ml of simulated mud (W=65%, mixed with specified amount of sand, silt, and clay) into each beaker. |
| ②Add MT-1.2.3 to each beaker, mix with spoon to make treated soil. |
| ③To simulate rainfall and add about 60ml of tap water to each beaker. |
| ④Take photos of the flooded of each treated soil. |
| 2.Photographs of test conditions |
Originally simulated mud |
MT-1 treated soil (Amount added : 3kg/m³) |
MT-2 treated soil (Amount added : 2kg/m³) |
MT-3 treated soil (Amount added : 2kg/m³) |
|
|
Home | Example of MT treated soil | Products | FAQs
The data and materials on this website are produced under the ownership of MORI Institute Environmental Technology Inc.
